Home
  Subscribe to eNewsletter
  Online
  Breaking News
  Blogs
  Web Exclusives
  eNewsletter Archives
  Video
  Webinars
  Current
  Features
  Column
  Industry News
  Codes
  Details
  Products
  Architect Profile
  Architect of the Month Application Form (PDF)
  Resources
  Market Research
  List Rental
  ARW Info
  Archives
  Contact Us
  Specs
  Digital Edition
  Archived Digital Editions
  ED+C Digital Edition
  Media Kit
  Related Publications
  ED+C
  Roofing Contractor
Search in: EditorialProductsCompanies
Details: Roofing

May 30, 2008

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare

Enlarge this picture
Detail courtesy of Al Mejia, IRT-Paragon Inc.


Equipment Support

This detail should be used to support mechanical equipment, piping, signs, and similar equipment that does not penetrate through the deck. The roofing and flashing application should be in accordance with the roof system manufacturer’s requirements.


Design Requirements

1. Curbing should be properly secured to the structural deck.

2. Curb height should be a minimum of twelve (12) inches above the deck surface and a minimum of eight (8) inches above the completed roof surface for proper flashing height.

3. Do not use pitch pans for equipment supports.

4. Provide crickets around equipment supports to eliminate the accumulation of standing (ponding) water in these areas.

5. Provide a minimal clearance of twelve (12) inches between equipment supports and stacks to allow for roof installation between these points.

6. Properly apply a metal covering over the curb. Metal covering should be secured to the equipment support curb and not to the roof.


|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.



Platinum:
Gold:

Silver:

Bronze:



E-Newsletter

Click here to subscribe to our free newsletter.


Subscribe For Free

Interested in FREE MAGAZINES? Start your subscription to any BNP publication by clicking here.
Subscribe










© 2010 BNP Media. All rights reserved. | Privacy Policy