Home
  Subscribe to eNewsletter
  Online
  Breaking News
  Blogs
  Web Exclusives
  eNewsletter Archives
  Video
  Webinars
  Current
  Features
  Column
  Industry News
  Codes
  Details
  Products
  Architect Profile
  Architect of the Month Application Form (PDF)
  Resources
  Market Research
  List Rental
  ARW Info
  Archives
  Contact Us
  Specs
  Digital Edition
  Archived Digital Editions
  ED+C Digital Edition
  Media Kit
  Related Publications
  ED+C
  Roofing Contractor
Search in: EditorialProductsCompanies
Details: Roofing
by John A. D'Annunzio
December 15, 2007

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare

Enlarge this picture
This gravel stop detail is courtesy of the NRCA. The NRCA suggests avoiding (where possible) flashing details that require rigid metal flanges to be embedded or sandwiched into the roof membrane.


Perimeter Gravel Stops

Perimeter gravel stops serve four primary functions on a roof system.

• They act as a barrier to hold aggregate in place.

• They serve as an edge termination for the membrane.

• They act as a rain shield.

• They serve as top surface for securement of the fascia metal.

Materials

The materials used for gravel stops must be metal or pre-molded plastic. The material must be watertight and flexible enough to accommodate thermal and differential movement. The flange width should be a minimum of 4 inches and not greater than the width of the nailer. Metal thickness should be in compliance with Factory Mutual Loss Prevention Data Sheet 1-49.

The gravel stop should be raised above the roof elevation with a sloped cant strip or wood nailer.

Execution

To set up a perimeter gravel stop:

1. Install flashing materials similar to the dimensions necessary to accommodate the flashing ply configurations shown on the related drawings.

2. Install one two-by-four wood nailer at perimeter edge to receive flashing and new metal.

3. Install one ply of flashing strip-in over the top of the nailers and down and out onto the roof approximately 6 inches beyond the base of the wall in an even application of the approved adhesive.

4. Following the same procedure, install a second ply of flashing membrane. This ply shall extend from the maximum flashing height down and onto the roof, approximately 2 inches beyond the previously installed ply.

5. Install a new perimeter edge fascia/gravel stop fabricated from similar metal material and color to match existing perimeter metal in width and fascia height. The gravel stop shall be secured with the appropriate fasteners every 8 inches on center.

6. Apply the approved butyl rubber sealant caulking at all metal coping joints. Caulking shall be completed in accordance with the manufacturer’s latest printed specifications.

7. Seal all flashing seams with an application of roof adhesive, membrane and aluminum coating.


John A. D'Annunzio
john_paragon@ameritech.net
John A. D'Annunzio is president of IRT Inc., with offices in Florida and Michigan. For more information, call 954-630-020, email info@bnpmedia.com or visit www.paragonroofingtech.com .

|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.



Platinum:
Gold:

Silver:

Bronze:



E-Newsletter

Click here to subscribe to our free newsletter.


Subscribe For Free

Interested in FREE MAGAZINES? Start your subscription to any BNP publication by clicking here.
Subscribe










© 2010 BNP Media. All rights reserved. | Privacy Policy